Advanced Estimate pricing accuracy

Short answer

Advanced Estimates price labor from the hourly rates saved in Settings > Estimate Labor, matched by trade. A Target rates for this project box before generating shows those rates and lets you change them for that job only. Any trade with no saved rate is priced from the project's own address — postal code first, then city, region, country — never a big-city average, and material prices come from local suppliers in your company's country.

Where: Settings > Estimate Labor, and the Target rates step just before an Advanced Estimate is generated

Plans: Agency and Enterprise (Advanced Estimates)

Make the AI price labor from your own rates

  1. Open Settings → Estimate Labor and add each role with its hourly rate, keeping it active.
  2. Start an Advanced Estimate and fill in the project details.
  3. On the step just before generating, the Target rates for this project box is already filled from those settings.
  4. Adjust anything you want for this job, then generate — matching trades use exactly those rates.

Office roles such as admin or office manager are not matched to field work, so they cannot price a trade.

Price a trade you have never saved

  1. Leave the trade out of your Estimate Labor list.
  2. Generate the estimate — WinkScope AI adds the trade and prices it from the project's location.
  3. The line is marked Added by WinkScope AI — check rate so you know where it came from.
  4. Correct the rate if you like; the line then shows Edited by you. Rates that came from your own settings show Your rate.

Those markers are for you only — they are never printed on the client's PDF or page.

Allow for material prices moving

  1. On the estimate, set the material price allowance between 0 and 10 percent to pad material totals in a volatile market, or switch it off entirely.
  2. Add the optional price escalation clause so a long-running job can be re-priced if supplier costs move.
  3. To lift prices across the board later, adjust items in the Price Book rather than re-doing estimates.

The allowance is shown as its own figure — it never quietly rewrites your supplier costs.

Rules and limits

Still stuck?

If WinkScope does not behave the way this page describes, do not work around it. Open a ticket from Support > My Tickets with the page you were on and a screenshot, and the team will look at the account directly.

Last verified 2026-10-07.